Raw aquifer in.
Specification out.

We design RO and WTP trains against your actual water analysis, commission them with numbers on paper — and certify the meters so every litre you draw stays on the record.

  • TrainsRO · softening · filtration packages
  • Design basisYour lab analysis, not assumptions
  • Rejection≥ 97% dissolved solids across membrane
  • MeteringClass-correct meters, calibrated & sealed
  • HandoverCommissioning report + O&M schedule

Bahasa Indonesia: Instalasi pengolahan air (IPA), water treatment plant, Reverse Osmosis (RO), pengolahan air baku industri, filter & softener air.

Ringkasan

Zona Limit merancang dan memasang instalasi RO (reverse osmosis) dan WTP/IPA untuk industri, rumah sakit dan instansi — dengan dasar desain hasil uji laboratorium air baku Anda, bukan asumsi. Cakupannya: filtrasi, softening, membran RO dengan rejeksi ≥ 97% padatan terlarut, post-treatment, metering tersertifikasi, dan laporan commissioning plus jadwal O&M. Contoh terpasang: instalasi RO di RSUD Cibabat, Cimahi. Basis Bandung sejak 2015.

Fig. 04 — Reverse-osmosis train & certified water meter
RAW FEED TDS 850 ppm BOOSTER PUMP RO MEMBRANE ELEMENTS REJECTION ≥ 97% REJECT TDS — ppm PERMEATE TDS — ppm
FLOW m³/H 000000 L TOTALISER · DN25 CLASS C CALIBRATED ✓ SEALED
Feed TDS850 ppm
Permeate TDS—
StatusStandby
Fig. 04 — Single-stage RO with brine reject; meter sealed after calibration across duty range.Illustrative train

ScopeMethod & deliverables

What the job includes

Analysis first. A lab analysis of your raw water sets the design basis — iron, hardness, TDS, microbiology. The train is chosen against those numbers.

The train. Filtration, softening or antiscalant as pre-treatment; high-pressure pump; RO membranes sized for your daily demand; post-treatment to hit your specification. Skid-mounted where possible, documented always.

Commissioning. Performance run with feed, permeate and reject readings recorded — the same numbers you see in Fig. 04, signed off on paper.

Certified metering. Correct meter class installed, verified across the duty range, sealed, and documented. Regulators get the record they expect; you get proof of every litre.

FAQPertanyaan umum

Before specifying a plant

Kenapa air sumur perlu diolah?

Air tanah sering membawa besi, kesadahan, atau padatan terlarut di atas baku mutu air minum maupun batas proses industri. Rangkaian RO/WTP dipilih berdasarkan hasil uji air Anda — bukan katalog umum.

Berapa besar rejeksi membran RO-nya?

Rancangan kami menargetkan rejeksi ≥ 97% padatan terlarut pada membran, dengan pre-treatment (filtrasi, softening, atau antiscalant) yang disesuaikan agar membran tidak cepat rusak. Angka feed, permeate dan reject dicatat saat commissioning.

Apakah instalasi tetap diservis setelah serah terima?

Ya. Membran perlu pencucian berkala dan akhirnya penggantian. Kami menyediakan kontrak perawatan yang mencakup consumable, pengecekan performa, dan panggilan darurat.

Next stepStart a conversation

Tell us about your site.
We’ll bring the science.

Send the location, intended use and timeline — the first consultation and a preliminary scope estimate are free.