Water wells · Hydrogeology · Treatment · Since 2015

Groundwater, engineered end to end

Deep wells, SIPA permits, geoelectric studies, RO treatment and pump service — planned from field data, built by our own crews, and maintained for the life of the asset.

Bahasa Indonesia: Jasa bor sumur dalam · izin SIPA · survei geolistrik · hidrogeologi & karst · instalasi RO/WTP · servis pompa celup — Bandung & seluruh Indonesia.

Scroll ↓
Core Values

Five commitments. Every well.

i.TrustMeasured partnerships, benchmarked periodically.
ii.CommitmentFirst survey to final discharge test — until it performs.
iii.Proven ScienceField data and sound engineering before every metre drilled.
iv.Cost OptimisationRight-sized design — no over-drilling, no under-specification.
v.QualityMaterials, workmanship and documentation held to specification.

Few vendors meet all five. Partner selection and benchmarking run periodically, so every collaboration stays measured, reliable and built for the long term — from a hospital well in Bandung to a mine dewatering study in Langkat.

Company Introduction

Get to know Zona Limit

A construction, procurement and service company built around one resource. We read the ground, size the design against the data, drill and equip with our own crews, and keep the well running long after handover.

  • Hydrogeology first. Geoelectrics, aquifer characterisation and pumping tests decide where and how deep we drill.
  • One accountable contractor. Pilot hole, casing, screen, gravel pack, pump and discharge test under a single scope.
  • Permits in parallel. SIPA and compliance files move alongside construction, not after it.
About Zona Limit 34 field records
Field crew running a geoelectric resistivity survey across an open site
How We Deliver

One chain, from survey to service

A production well, an irrigation program, a permit file or a treatment train — the same five-step chain applies, with one schedule and one point of accountability.

01

Listen & survey

Your site, your water problem, your numbers — measured before anything is promised.

Site visit · demand
02

Study

Geoelectrics, aquifer data and hydrogeology fix the design before steel moves.

Data · design
03

Build

Drilling, casing, screen and construction by our own crews and rigs.

Drill · equip
04

Permit

SIPA and compliance files prepared in parallel, ready when the pump test is signed.

SIPA · compliance
05

Sustain

Maintenance, treatment and pump service for the long haul.

Service · rehab
Track Record

Numbers built in the field

34

Field records delivered since 2015

250 m

Deepest production well in our range

08

Service lines under one contract

03

SBU construction credentials

05

Pillars of practice

2015

Operating continuously from Bandung

Our Footprints

From a Bandung workshop to sites across the archipelago

Headquartered on Jl. PHH. Mustofa in Bandung, working across West Java and beyond — hospitals in Bandung and Cimahi, an artesian well in Semarang, karst studies in Langkat, geoelectrics in Tuban and Gresik. One crew, one standard, wherever the water is.

Nationwide
Sumatra Kalimantan Jawa Sulawesi Papua LANGKAT BANDUNG HQ SEMARANG TUBAN GRESIK

Bandung · HQ

Jl. PHH. Mustofa No. 35 — deep well at RSKG Ny. RA. Habibie and HQ for every field program.

Select a pin or a location chip to read the record behind it.
Footprints · Sphere The same eleven locations on a globe drawn from Natural Earth coastlines — Bandung and Cimahi in the highlands, the north-coast well fields, Langkat in Sumatra, then Bali and Lombok. Drag to spin; release and it carries a little momentum.
Credentials & Clients

Recognised where it is filed

SP008 Pekerjaan Pengeboran Sumur Air Tanah Dalam — SBU grade K2 SBU Jasa Konstruksi
SP007 Pekerjaan Pondasi, termasuk pemancangannya — SBU grade K1 SBU Jasa Konstruksi
SP001 Pekerjaan Penyelidikan Lapangan — SBU grade K1 SBU Jasa Konstruksi
2015 Operating continuously from Bandung — 34 field records across Indonesia CV Zona Limit
Trusted by Jasa MargaIndocementSemen GresikRSUD CibabatBadan GeologiPhapros TbkPemprov BantenUPTD PPP DISPERSKIM
Pertanyaan Umum · FAQ

Questions we answer before the survey

Apa itu jasa bor sumur dalam?

Pengeboran akuifer dalam untuk air baku industri, rumah sakit dan instansi. Zona Limit mengerjakan sumur produksi kedalaman 40–250 m: lubang pilot, konstruksi casing, uji pemompaan, sampai izin SIPA terbit.

Berapa lama pengurusan izin SIPA?

Izin SIPA diproses paralel dengan pengeboran, bukan setelahnya. Berkas disiapkan sejak survei awal, sehingga sumur dapat segera dioperasikan setelah uji pompa disetujui.

Apakah Zona Limit melayani survei geolistrik dan studi karst?

Ya. Tim studi kami mengerjakan geolistrik 2D, karakterisasi akuifer, penentuan kawasan karst dan uji pemompaan — termasuk untuk PT Semen Gresik dan PT Indocement Tunggal Perkasa.

Di mana Zona Limit beroperasi dan bagaimana menghubungi?

Jl. PHH. Mustofa No. 35, Bandung, Jawa Barat. Melayani seluruh Indonesia sejak 2015 dengan 34 proyek terkirim. WhatsApp +62 812-2199-346, email [email protected].

Start a Conversation

Tell us about your site.
We’ll bring the science.

A production well, an irrigation program, a permit file or a full treatment train — send the problem, not a template. Site visits across West Java and beyond.

[email protected] WhatsApp Contact form